I am building a new home on raw land. Will eventually have solar and battery bank. Main power will come in at a pole with a disconnect and then a 200amp distribution panel. From that panel one line will go to a workshop, one line to a guest home, one line to my new house. All work being done in stages and buildings could be >200ft apart. Wondered if I can plan the new service to improve my Sense detection and use? One sense on mains or perhaps one on each sub panel closer to the destination? Ideas?
This topic was automatically closed 365 days after the last reply. New replies are no longer allowed.